RINA is in bidding phase for a PMS contract, relevant to a FPSO Commissioning .
Main scope of hull and topside fabrication will be executed in singapore, where all integration activities will be carried out.
Duration of the services to be performed: 6 months (extendable)
Expected Starting date: Q4 2025
We are looking for the following positions:
1.
Commissioning Engineer (Hull)
2.
Commissioning Engineer (Topside)
3.
Commissioning Engineer (Common System)
4.
Automation Engineer
5.
Telecom Engineer
6.
IT/Telecom Specialist
Preference for candidates with previous experience in the Oil&Gas sectors ( FLNG/FPSO projects is a plus)
#LI-WB1